Sector

Healthcare

Services

Construction management

Project Type

New Construction

Client

Reinier de Graaf Hospital

Location

Voorburg

Architect

EGM architects

Advisors

Royal Haskoning/DHV
Deerns
Wolf+Dikken

Contractor

Du Prie construction & development
Schoonderbeek Installation Group
Van Dorp

Surface

2.380 m²

Project period

2019 – 2021

delivery

2021

Project Managers

No project manager found

Reinier de Graaf Voorburg Treatment Center

Development

Reinier de Graaf Hospital has built a new treatment center in Voorburg. In addition to consultation and examination rooms and independent treatment rooms for a large number of general specialties, blood collection points, X-ray facilities and an IVF center (incl. laboratory) have been realized. The treatment center was built on the foundations of an old Sister’s apartment building. Stevens Van Dijck was responsible for construction management. Treatment Center Voorburg will be structurally completed in October 2021 and open in February 2022.

Building function

The first floor houses the multidisciplinary Fertility Center Voorburg. The Fertility Center provides high-quality care in the examination and treatment of infertility. The center’s laboratory environment is built according to clean room guidelines (GMP Class D); a sterile working environment with optimal air technology.

Details

The site has high archaeological value because it is located above an ancient Roman city (Forum Hadriani) whose remains are still present in the ground. Therefore, it was not permitted to erect new construction on the site. The treatment center was built on the foundations of an old Sister’s apartment building. The existing foundation had to be poured above ground level. On top of this is a first floor that floats above ground level by means of an overhang, of 5-8 m around the building.

© PHOTOGRAPHY:

Frank van der Burg

Related projects

Healthcare, Residential |
New Construction, Renovation